rafaelmoneo.com utiliza cookies propias y de terceros para mejorar tu experiencia de usuario y obtener información estadística sobre tus hábitos de navegación. Al consentir, aceptas estos usos, si bien podrás retirar este consentimiento en cualquier momento a través de las funciones de tu navegador.   Aviso legal    Política de privacidad y Política de cookies

NOVARTIS LABORATORIES

< ll >

NOVARTIS LABORATORIES
Basel, Switzerland

2005-2008

  • This laboratory building is located on the beautiful Novartis Campus in Basel, which can be described as a miniature Manhattan with a diverse series of buildings – each with a different function – designed by different architects. In this case, the arcade in architect Lampugnani’s plan is given a powerful metallic structure that blows life into it as well as the vigor to hold its own against Frank Gehry’s building. Perhaps the main interest of this building lies in its floor plan: the laboratories are located at the center, and the public access zones along the perimeter.

  • LOCATION:

    Novartis Campus, Basel, Switzerland

  • CLIENT:

    Novartis Pharma AG

  • PROGRAM:

    48 Biological and Chemical processes laboratories (70,000 sf)
    1 Restaurant and kitchens for 300 people
    Offices and meeting rooms
    Storage

  • ARCHITECT:

    Rafael Moneo

  • PROJECT TEAM:

    Associate Architect: Hayden Salter
    Project team: Agatangelo Soler, Edgar Sarli
    Local architect: Wirth+Wirth
    General planner: Henn Architekten, Kai Henne (Project Architect)

  • COLLABORATORS:

    Construction Engineer: Lüschinger + Meyer
    Mechanical Engineer: Ing. Büro Mayer
    Laboratory Engineer: Dr. Heinekamp
    Electrical Engineer/Instrumentation: Herzog Kull Group

  • BUDGET:

    42.000.000 €

  • SURFACE AREA:

    14.465 m2

  • DATE:

    Commission: 2005
    Construction: 2006-2008

  • PICTURES:

    © Duccio Malagamba